Introduction
The Movement Details page explains the capability for a user to add or consolidate shipments to a movement. The Movement Detail page has a Load Builder functionality which pictorially represents the current movement with respect to its equipment's capacity. It also provides an easier way to build the equipment to its full capacity by suggesting possible shipment candidates and displaying the impact to the movement's capacity when adding additional shipments.
Using the Load Builder Functionality
- Log on to the One Network system.
- Click Transportation > Awaiting and locate a single–shipment movement or multi-shipment movement on the page.
- Click the Movement Number hyperlink to display the associated Movement Details page.
- The Movement Details page is displayed and is divided into multiple windows with tabs:
- The window located in the upper-left part of the page under the Header tab contains information on the movement and the associated movement number.
- When you click the Load Builder tab, the window displays a pictorial representation of a truck.
- The truck contains the following information in a graphical view as compared to the equipment's weight, volume, and quantity capacity:
- Movement Weight (in green)
- Volume (in blue) and
- Quantity (in orange).
- For each bar graph, there are three capacity numbers:
- The first represents the movement's value.
- The second represents the equipment's value.
- The third represents the remaining capacity.
For example, in the screenshot below, for the weight bar graph, the movement's weight is 1500 pounds, The equipment's weight capacity is 2000 pounds and the remaining truck's weight capacity is 500 pounds.
- Shipments can be dragged and dropped from the right side of the screen onto the truck pictorial to update the quantities of the shipment. This helps the user to load a truck to its full capacity.
- The window located in the lower left part of the page under the Shipments tab displays the shipment summary information.
- The window located on the right part of the page is the list of available shipments.
- The list contains shipments that have the same or compatible equipment and service level as the selected movement.
- By default, this window shows shipments whose "Pickup Date Range Start" is within 7 days as compared to the "Pickup Date Range Start" of the selected movement.
To display shipments with an increased date range, click on the "Filters (edit)" link and modify the "Date Tolerance (Days)" field.
This field can only be modified to a maximum of 30 days.
- The shipments listed with the plus symbol are ones that are available and can be added to the movement.
- The shipments listed without the plus symbol are the ones that are already associated with this movement.
- To add an additional shipment to the movement:
- Click the plus symbol next to an available shipment
- Drag and drop a shipment onto the truck symbol under the Load Builder tab window (upper left window)
Drag and drop the shipment onto the Shipments tab window (lower left window).
The newly added shipment is highlighted in yellow in the Shipments tab window. In the Load Builder tab window, the capacity is updated to reflect the additional shipment added to the movement
- The window located in the upper-left part of the page under the Header tab contains information on the movement and the associated movement number.
- Click Save to add the shipment to the movement. A success message is displayed.
- Return to the Awaiting page and refresh the page to see the new shipment that is consolidated under the movement.