Introduction
This document provides a quick guide on how to create a shipment in the One Network system.
Creating a Shipment
- Log on to the One Network system.
- Select Transportation > New Shipment to open the New Shipment page.
- Enter the following details on the New Shipment page:
Shipment Number
You can use a system-generated shipment number if required.
Ship From Site
The shipper will populate based on the information entered.
Ship To Site
The consignee will populate based on the information entered.
- Equipment
- Pickup date range
- Delivery date range
- Click the Content tab to enter information pertaining to the shipment lines.
- Click the Add Line link to display the New Shipment Line window to enter the line information.
- On the New Shipment Line pop-up window, enter the following shipment line information:
- Line Number (auto-generated)
- Item
- Weight
- Volume
- Shipped Quantity and Quantity Unit of Measure
- Click Add to save the shipment line information.
- Repeat this process to add more shipment lines.
- On the Schedule tab, enter the following shipment attribute information:
- Appointment Required (checkbox)
- Partner
- Partner Profile
- Commodity Code
- Appointment Code
- Load Type
- After all shipment information is entered on the various tabs, click Save on the bottom of the page to create the shipment.
A success message is displayed, indicating that he shipment has been created.