You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Introduction

This document provides a quick guide explaining how to create a Shipment in the One Network System.

Creating a Shipment

  1. Log in to the One Network system.

Select Transportation > New Shipment to open the New Shipment page.


The New Shipment page is displayed with the Header tab selected.

 

    1. Shipment Number

      You can use system generated shipment number if required.

    2. Ship From Site 

       

      Shipper will populate based on this information entered

       

       

    3. Ship To Site (note – Consignee will populate based on this information entered)
    4. Equipment
    5. Pickup Date Range
    6. Delivery Date Range

  1. Click  the Content tab to enter information pertaining to the shipment lines.
  2. Click the Add Line link to display the New Shipment Line popup to enter the line information. 
  3. On the New Shipment Line popup, enter the shipment line information:
    1. Line Number (auto-generated)
    2. Item
    3. Weight
    4. Volume
    5. Shipped Quantity and Quantity Unit of Measure

  4. After entering the shipment line information, click Add on the popup.


  5. Repeat this process to add additional shipment lines.  Click the Schedule tab to enter shipment attribute information:
    1. Appointment Required (checkbox)
    2. Partner
    3. Partner Profile
    4. Commodity Code
    5. Appointment Code
    6. Load Type



  6. After all shipment information has been entered on the various tabs, press the Save button on the bottom of the screen to create the shipment.
    A success message will be displayed indicating the shipment has been created. 

 

  • No labels